THIRSK AND MALTON CONSTITUENCY AREA PLANNING COMMITTEE
SUPPLEMENTARY TO COMMITTEE REPORTS
16 January 2025
Agenda Item |
Application number and Division |
Respondent |
|
5 |
ZB23/02504/FUL Hillside & Raskelf
|
Parish Council
Agent
Officer
|
Parish Council provided a request that Members visited certain locations to view the site.
A section drawing has been submitted by the Parish Council to indicate the dominant nature of the lodges on the site. Note of items not included on 7th Jan 2025 site layout: - Packaged sewage treatment plant - Attenuation pond for SuDS - Childrens’ play area Parish Council comment received 13.1.2025:
“Ref Applicants' Submission of a Fourth
Version of the Above Scheme
- No attempt to portray the impact on landscape
have accompanied the applicants' proposal so the PC has again
commissioned updated CGI images which we believe will confirm
beyond reasonable doubt that the development represents an
unacceptable intrusion into a currently open
landscape.
Email received from Agent 13.1.2024:
Further to this morning’s Cttee Site Visit we wish to clarify the following:
· Lodge orientation – glazed gable(s) all face south into the hillside. · Road construction – geo grid, self draining, to have a lesser landscape visual impact. Covered off by Condition 03. · Lodge level – located on the 2nd tier of land above the valley floor where the land is relatively flat. This is covered by Condition 04 which requires cross sections to be submitted post decision. Rather than ‘cut a fill’ there is likely to be a small amount of levelling and any spoil taken off will be redistributed around the lodge bases so that there are no large void areas. · Waste storage and collection area is shown on the Site layout Plan to the left of the access road where it meets at the four points at the foot of the incline.
Additional drawing to be added to Condition 2 – list of approved plans.
- Visibility splay drawing T1071 –004 received 4.3.24
Agent has provided an NPPF update (6.1.2025)– generic clarification on paragraph updates
Agent has provided indicative landscape plan (8.1.2025) to reflect the latest site layout |